  1. CADANGAN PROJEK



I.           Tajuk Projek :
HOME APPLIANCES CONTROL VIA POWER LINE COMMUNICATION (PLC)








II.        Nama Pelajar :
NADIAH  BINTI MD RHADZI









III.      No. Matrik Pelajar :
B
0
2
0
8
1
0
1
0
6
IV.                Kursus :
BENW




Nama Penyelia 1:  ENCIK MAZRAN BIN ESRO




Nama Penyelia 2 (Jika ada) :









……………………………………………...
……………………………………………...
(Tandatangan Pelajar)
(Tandatangan Penyelia & Cop)














Nama
: Nadiah binti Md Rhadzi
Tarikh
: ……………………………....




Tarikh
: ……………………………....
Samb. Tel
: ……………………………....












  1. RINGKASAN PROJEK
Ringkasan projek yang dicadangkan tidak melebihi 200 patah perkataan

The project title is Home appliance control via Power Line Communication (PLC) that will be using PLC modem to connect and control between appliances to a PIC controller. Once the cable of home appliances are plug in to the PLC modem socket, the PIC is able to control the PLC modem and turn on the appliances such as fan, television and lights remotely. Home appliances network able to connect to AC power outlet and control by Power Line Communication (PLC) that have the ability to send high-speed digital data over the power lines between substations and homes and offices.



  1. PENYATAAN MASALAH DAN OBJEKTIF PROJEK
Sila nyatakan secara jelas masalah dan objektif untuk projek yang dicadangkan.

Compare to the current problem, utilities need to control the electrical equipment manually and do not have remote to control their appliances when they are outside of their home or the switch is away from the user actual situation. There are many methods such as wireless, wired Mod bus, RS 485, CAN and so on. Another alternative method to reduce wire harness at home or office by using existing power outlet. Instead, there are several objectives as follows:

-       To control home appliances remotely.
-       To apply an alternative method besides the wireless communication system where the data transmitted using existing power lines.
-       To reduce wire harness using existing power outlet.
-       To apply the PLC modem with PIC, switch and home appliance.



  1. SKOP KERJA
Terangkan secara jelas skop kerja projek.

The project will use PIC as the controller, PLC modem for wireless network, remote switch to control the appliances, AT command for PLC advanced configuration to control a modem and RS 232 daughter card inclusive in the PLC modem.


  1. METODOLOGI PROJEK
Terangkan prosedur dan kaedah yang akan digunakan untuk mencapai objektif projek.
This project using remote circuit, PLC modem and the PIC controller. The PIC will use C programming to control the remote and PLC modem. Meanwhile, PLC modem require AT command configuration in order to connect to the home appliances. In Part 1 will explain about software development for PIC and PLC, Part 2 for hardware development and Part 3 for interface of the project.
                       Part 1 Software             Part 2 Hardware                 Part 3 Project


  The diagram of connection between PLC modem, PIC controller and the home appliances.



  1. JANGKAAN HASIL
Bincangkan jangkaan hasil untuk projek yang dicadangkan.

From the expectation, this hardware will be using PLC modem to connect and control between the home appliances to a controller using PIC controller. Once the project success, all the consumer will able to control all of their electrical appliances in a single remote.



  1. RUJUKAN
Senaraikan rujukan yang digunakan dalam projek yang dicadangkan..

 [1] UART/RS232/RS485/USB/Ethernet over Power line Communication Transceiver,
       Linksprite Technologies,Inc, January,2009

 [2] July 24, 2010. SparkFun Electronics Powerline Communication Modem PLC-UART.
                        http://www.sparkfun.com/commerce/product_info.php?products.

 [3] July 25, 2010. Power Line Modem.
            http://www.anglia-m2m.com/power_line_modems.asp

Senaraikan aktiviti-aktiviti utama bagi projek yang dicadangkan. Nyatakan jangka masa yang diperlukan bagi setiap aktiviti.

2010
Project Activities:
July
August
September
October
November
Disember

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20




Find PSM project:
Taklimat PSM







Cuti Pertengahan Semester 1






Cuti Ulang Kaji
Peperiksaan Akhir Semester 1
Cuti Akhir Semester 1
- Discuss with supervisor.
- Research on PLC, PIC theory.
- Project registration.
Proposal submission













Literature Review Summary













- Find the journals, references and articles.





Research on the Software :













- study on CCS C program & Simulate using Proteus


- PIC - start with simple program LED



- AT command





- RS232 daughter card





PCB Design













PSM 1 Seminar.














Preliminary report submission to supervisor.













Cuti Ulang Kaji
Hardware Construction:













- Remote circuit
- PIC circuit
- RS232 circuit


I. PERANCANGAN PROJEK


Senaraikan aktiviti-aktiviti utama bagi projek yang dicadangkan. Nyatakan jangka masa yang diperlukan bagi setiap aktiviti.



2011

Project Activities:
January
February
March
April
May


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Hardware Construction:




Cuti Pertengahan Semester 2










Cuti Ulang Kaji
Peperiksaan Akhir Semester 2



- Remote circuit

- PIC circuit

- RS232 circuit

Software development:

















- PIC programming

- AT command

- Burn to PIC

Hardware development:

















- PIC circuit



- Remote circuit



- PLC socket



- Prototype



Seminar PSM 2

















Revision for PSM final report

















Submit PSM draf final report to supervisor

















Submit PSM report with book cover to faculty